Main specifications of the project

Construction of a wharf and mechanized terminal of minerals in the west of Shahid Rajaei port

  • A wharf for minerals
  • Final Capacity for loading and unloading:10 million tons of minerals and 5 million tons of metal products
    Phase 1: 5 million tons of minerals and 2 million tons of metal products
    Phase 2: 5 million tons of minerals and 3 million tons of metal products
  • Construction of 14 railway lines with the length of 17 km (rail yards)h
  • Area: 71 Hecatres
  • A 150,000-ton Vessel
  • The depth of the water inlet is minus 17 meters.

The Most Important Advantages of Project Implementation

  • Establishing a specialized mechanized terminal for unloading and loading minerals with a focus on rail transport of minerals from relevant sources of Shahid Rajai Port.
  • The construction of the wharf along with the relevant equipment will lead to the improvement of the operational capacity of the country's mineral exports and imports.
  • Using a high-capacity ship to speed up the ability to export and import minerals
  • Creating sustainable employment in the region, reducing road accidents in the region due to concentration on rail transport.
  • Reducing pollutants and air pollution due to unloading and loading operations with a fully mechanized method.
  • Reducing the stopping time of wagons at railway stations
  • Increased efficiency due to using wagons belonging to railway companies and the consequent increased income.
  • Reduction in road transport, fuel consumption, damage to infrastructure and road accidents.
  • Using high-tonnage ships in the specialized wharf reduces the goods loading time and the total price.

Prroject Pictures

Click on each image to zoom in